3.0329.2 Build 20160831035042

Performance and Stability Enhancements:

      Actions

      On Completion of a Log Book Action, the ‘Next Action Due’ is now being calculated correctly

      The Log Book Reading Date is now formatting as DD/MM/YYYY

      Warnings

      The Action Form, Asset Picker has a problem and should not be used. Instead, the ‘Move Action’ Task can be used to select the Asset for a new Request Action and to move other Actions to other Assets

      A side effect of the work performed in delivering version 3.0329 and 3.329.1 is that, temporarily, the System Option ‘Allow Contractors to Complete Actions’ must be ticked for Users to be able to Complete Actions. This issue will be resolved in version 3.0330

      IT Related

      As this is a Patch Release to version 3.0329, we have changed the version numbering to reflect this.

      The drawback is, when installing over version 3.0329 or 3.0329.1, a “false” item is left in the Windows ‘Programs and Features’ list. However, this can be removed.

      The Conquest Product Management Console is nearly finished, which, in version 3.0330, entirely replaces the Conquest III Installer and will make the preceding problem a thing of the past