Foresight 1.0106
• The version number system has changed from 1.1.6 to 1.0106
• Projects are now organized in a Hierarchical structure supported by administrative tools and user selection tools, when adding and copying Projects
• When a Foresight Project is copied, a dialog gives the option to include or not include the Expense Stream values with the Project data
• A Scenario can be copied within a Project that does not have a preferred Scenario. The User must have Edit permission to the Project. The “Copy Scenario” button opens a dialog to copy the selected Scenario to a new one, with options to include or not include the value data
Previous version - 1.1.5
• Non-administrator Users are now able to create a new Project, either from the “New Project” button or “Copy Project” button. Copied Projects don’t include values.
• Reports now support scaling of the Scenario values to make long projects fit the page better
• Reports support Landscape/Portrait
• Reports can go to any selected printer e.g. A3 printer if required.
• Button bar tooltips have been standardized
• Bug fixes